Former Worker Says AmerenUE, NRC Dropped Inquiry
- Loading Comments...
ALAN SCHER ZAGIER
COLUMBIA, Mo. (AP) — A former AmerenUE engineer is accusing the utility and the federal agency that regulates nuclear power of failing to adequately investigate a 2003 incident that led to a two-hour unplanned shutdown at the Callaway reactor.
A Nuclear Regulatory Commission investigation found that control room operators delayed a move to insert control rods — equipment required to keep the reactor shut down — since the error occurred just before a scheduled shutdown for maintenance. The NRC called the delay "not prudent," but noted it did not threaten human safety.
After discovering the problem four years after it occurred during a routine review and alerting plant managers, nuclear engineer Lawrence Criscione claimed retaliation by his supervisors, including a negative performance review and the loss of his operators' license. ...
Recent Comments
| Dow Jones | S&P 500 | NASDAQ | 10-Year Note | |
|---|---|---|---|---|
| 10,328.89 | 1,102.47 | 2,211.69 | 35.46 |
Oil *
73.88
|
|
UP
20.63
|
UP
6.40
|
UP
31.64
|
UP
0.59
|
10 Yr
3.55%
SPDR Gold
108.95
|
|
+0.20%
|
+0.58%
|
+1.45%
|
+1.69%
|
Data delayed 20 minutes |


Connect with TheStreet