This Day On The Street
Continue to site
ADVERTISEMENT
This account is pending registration confirmation. Please click on the link within the confirmation email previously sent you to complete registration.
Need a new registration confirmation email? Click here

Duluth Metals Provides Twin Metals Minnesota Project Pre-feasibility Update

  • Pre-feasibility completion scheduled for mid-year, 2014.
  • A new comprehensive NI 43-101 compliant Technical Report on the Pre-Feasibility Study is scheduled for completion by mid-year, 2014.
  • In addition, a NI 43-101 compliant Technical Report on an updated Resource for the project will be completed by Spring, 2014.

TORONTO, Jan. 7, 2014 /PRNewswire/ - Duluth Metals Limited ("Duluth Metals") (TSX: DM) (TSX: DM.U) is pleased to announce that the Twin Metals Minnesota Project ("Twin Metals") Pre-feasibility is progressing well with a completion date scheduled for mid-year 2014. Over the next few months, the main focus is the completion of the Pre-feasibility Study and delivering by mid-year a comprehensive NI 43-101 compliant Technical Report on this phase of the project development.  In addition, a NI 43-101 compliant Technical Report on an updated resource estimate for the project is scheduled to be completed by Spring, 2014.  The updated resource estimate will incorporate all drilling since September 2012, including the 35 closely spaced diamond drill holes within the Maturi Deposit designed to provide the Joint Venture team the necessary information to define the drill spacing required to upgrade Indicated to Measured Resource within the resource base (see Duluth Metals press release dated Dec 6, 2013, "Duluth Metals Announces Results from Twin Metals Fence Drilling Program").

The Twin Metals copper-nickel-platinum-palladium-gold project is being developed by joint venture partners Antofagasta plc and Duluth Metals. Over the last year, Twin Metals has concentrated on optimizing the project in every dimension, including:

  • Mine planning, including a detailed mining plan utilizing large scale underground mining methods
  • Metallurgy, including detailed analysis of selective flotation and downstream processing
  • Various milling capacity options
  • Surface facility definition and planning
  • Environmental studies and planning
  • Marketing studies for various products




1 of 2

Check Out Our Best Services for Investors

Action Alerts PLUS

Portfolio Manager Jim Cramer and Director of Research Jack Mohr reveal their investment tactics while giving advanced notice before every trade.

Product Features:
  • $2.5+ million portfolio
  • Large-cap and dividend focus
  • Intraday trade alerts from Cramer
Quant Ratings

Access the tool that DOMINATES the Russell 2000 and the S&P 500.

Product Features:
  • Buy, hold, or sell recommendations for over 4,300 stocks
  • Unlimited research reports on your favorite stocks
  • A custom stock screener
Stocks Under $10

David Peltier uncovers low dollar stocks with serious upside potential that are flying under Wall Street's radar.

Product Features:
  • Model portfolio
  • Stocks trading below $10
  • Intraday trade alerts
14-Days Free
Only $9.95
14-Days Free
To begin commenting right away, you can log in below using your Disqus, Facebook, Twitter, OpenID or Yahoo login credentials. Alternatively, you can post a comment as a "guest" just by entering an email address. Your use of the commenting tool is subject to multiple terms of service/use and privacy policies - see here for more details.
Submit an article to us!
SYM TRADE IT LAST %CHG

Markets

DOW 17,826.30 -279.47 -1.54%
S&P 500 2,081.18 -23.81 -1.13%
NASDAQ 4,931.8150 -75.9760 -1.52%

Partners Compare Online Brokers

Free Reports

Top Rated Stocks Top Rated Funds Top Rated ETFs